Skip to main content
search

Overview

This 31m x 12.7m platform scheme allows returning waste and packaging at a large distribution centre to be processed externally and not tie up loading docks for the outbound delivery vehicles.

The scheme consisted of:

  • 44 x Modular Dock Modules
  • 14 x Hinged Barriers
  • 7 x Manual Edge of Dock Levellers
  • 7 x Traffic Lights
  • 7 x Dock Lights
  • 2 x Access Steps
  • 1 x Mobile Access Ramp

The schemes capacity is 6,000Kg.

Gallery