Overview
This 31.5m x 7.5m platform scheme was installed outside at a large distribution centre. Existing ramps were utilised to allow fork truck access to the platform from ground level.
8 loading docks were created, each with gas-spring assisted safety barrier, vehicle alignment curbs, and a dockboard / manual dock leveller.





