Skip to main content
search

Overview

On taking on a new Facility it was found that there was the need for a platform as previously supplied to other sites, however the challenge of the new site required a larger platform and also the need to unload and offload at a 90 degree angle, the size and requirement lended itself to a fixed platform but as the doorway could not be permanently blocked a special movable lightweight platform was designed so that it could achieve all the design requirements of the operation but still be movable.

Gallery