Logistics specialist Witron has benefited from the strength and versatility of bespoke loading ramps during its construction of a new distribution centre for a retail customer. The largest of the four ramps delivered to the Cheshire site had to withstand the weight of a 48-tonne crane.

The first three ramps are being used by Witron to help move plant, pallets and roll cages into the DC’s dispatch zones.

Thorworld returned to install the last – and most complex – of the four ramps. “To optimise the flow of goods through the DC, we erect racking at ground level, in strategically located pits.  The racking must be installed by crane, therefore we needed a ramp specifically built to allow the crane easy access in and out of the building.”

Ian Langan, Technical and Engineering Director at Thorworld, particularly enjoyed the challenge of designing a ramp capable of withstanding the weight of the crane.  “Normally our mobile ramps have a usable width of 2250mm and up to 15,000kg capacity. The crane weighed 48,000KG and required a usable width of 3.5m and a ramp length of 8m.

“We had to undertake design calculations and finite element analysis (FEA), to ensure the capacities and axle loads could be adequately supported.  And then manufacture all four ramps from scratch within a very short timescale!”

Unusually for Thorworld & LBS, the four ramps are only needed during the fit-out of the distribution centre and will not be in regular use.  Nonetheless, Witron has recognised their long-term value.  “All of our DCs are built to a similar specification, so we’ll definitely need the Thorworld ramps again! Until then, we’ll keep them in storage, ready for the next site build.”